    PROJECT INTRODUCTION
    CECEP·SHANGHAI CENTER
    The plastering area of the CECEP·SHANGHAI CENTER is about 170000 square meters. In the project, three "Weijian plastering robots" achieve automatic walking, leveling, feeding, and plastering construction for basement panel content construction. Each device completes a stable plastering operation of about 300 square meters per day, which is 4-5 times more efficient than manual plastering.
    施工情况
    施工类型
    抹灰
    施工面积
    154000
    施工时间
    2023
    人员配置
    一台机器搭配2个大工
    砂浆供应方式
    柱塞泵
    施工平均效率
    350㎡/台/天
    施工最高效率
    ㎡/台/天
    机器人台数
    3
    垂平检测合格率
    %
    空鼓检测合格率
    %